Sustainable Design PortfolioServicesBlogNewsAbout PAECareersContact

Sherwood Public Library & Civic Center

Sherwood, Oregon

PROJECT INFO

  • Building Type: Library, Civic Center and City Admin Offices
  • Architect: THA Architecture
  • Owner: City of Sherwood
  • Size: 35,500 square feet
  • Cost: $6.7 million construction cost

Special Features

  • Displacement ventilation via underfloor air distribution system
  • High efficiency natural gas boiler
  • Integrated electrical system allowing for convenient moves, additions and changes
  • Energy efficient lighting system
  • Permanent carbon dioxide monitoring system
  • Electronic space temperature control

SUSTAINABLE DESIGN ELEMENTS

Achieved:

Energy efficiency 20% better than code


PAE ROLE

Mechanical Engineering

Electrical Engineering

Commissioning