Sustainable Design PortfolioServicesBlogNewsAbout PAECareersContact

Southwest Oregon Regional Airport

North Bend, Oregon

PROJECT INFO

  • Building Type: Airport Terminal Building including Port Authority administration offices, TSA baggage inspection and scanning, rental car facility and FAA Control Tower
  • Architect: Zimmer Gunsul Frasca Architects
  • Owner:
  • Size: 30,000 square feet
  • Cost: $18 million construction cost

Special Features

  • Low pressure ventilation to reduce fan energy consumption
  • Demand control ventilation
  • Mixed air system utilizing re-use of conditioned air

PAE ROLE

Mechanical Engineering

Electrical Engineering

Telecom/Low Voltage System Design

Architectural Lighting Design
(via Luma Lighting Design)